Procedure For Restart The Activities After Power Failure / Breakdown

1.0         Purpose    :       To provide a documented procedure for Procedure For Restart The Activities After                  Power Failure / Breakdown
                       
2.0         Objective  :      Procedure For Restart The Activities After  Power Failure / Breakdown

       
3.0     Scope       :   This SOP is applicable for. Restart The Activities After Power Failure / Breakdown at -----Pharmaceuticals   Ltd, 

4.0     Responsibility  :
·        Primary: Technician Engineering
·        Secondary: Manager Engineering   

5.0    Procedure :
·         Power failure:
Ø      Check the main power circuit panel for voltage and break down.

Ø      Start the D.G. Set and check the voltage and frequency, it should be 430 V and 50 HZ

Ø      Then changeover the power supply from G.E.B. to D.G. Set for normal operation.

Ø      After resuming the power supply from G.E.B. check the voltage and frequency.

Ø      Before changing over power supply from D.G. Set power supply inform the critical

Ø      Processing areas personnel and switch. the power supply for normal working.

·          BREAKDOWN :
Ø      In case of breakdown of power supply, confirm the nature of breakdown.

Ø      Start the D.G. Set

Ø      Check the voltage and frequency; it should be 430 V & 50 HZ.

Ø      Change over the power supply from G.E.B. to D.G. Set for normal working.


Ø      After attending the breakdown of power supply, restore the power supply and check   the voltage and frequency of mains.

Before change over the power supply from D.G. Set to G.E.B. power supply inform to critical activities area personnel for normal working.