Process Flow-Sheet of QA Person
Stage.1: BMR & R. M requisition issue by Quality Assurance (QA). |
Stage.2: Indent of R. M. & P.M. Requisitions by Production as per BMR. |
Stage.3: Requisition checking & stamping the BMR by Quality Assurance (QA). |
Stage.4: Dispensing of Raw & Packing Materials in presence of Production, QA & Store person. |
Stage.5: (After Issuing) Verification of Raw & Packing Materials by Production person. |
Stage.6: Equipment & Area Clearance by QA. |
Stage 7: Preparation of Bulk in process (Intermediate) |
Stage.8 : Centrifuge & Drying. |
Stage.9. Milling of oversized granules if required. |
Stage.10: Intermediate granules Sampling, Testing and Release by Quality Control (QC). |
Stage.11: After Testing and Release of bulk or in process by Quality Control (QC), |
Stage.12: QA in process Checking. bulk Wt variation, etc. |
Stage 13 Wet product Drying ,after Milling and sifter |
Stage.14: Line Clearance by QA for Packing Activity. |
Stage.15: Overprinting & approval of Primary & Secondary Packing Materials. |
Stage.16: Final Packing. |
Stage.17: Collecting the retain samples by Q. C. |
Stage.18: Finished product Sampling, Testing and Release of Finish Product by Quality Control (QC). |
Stage19: Finished Product Transfer slip issued by approved chemist to Bonded Store Room. (BSR) / Finished Goods Store (FGS). |
Stage.20: F. P. Inspection & release By Q. A. |
Stage.21: Dispatch of F. P. |