Process Flow-Sheet of QA Person
| Stage.1: BMR & R. M requisition issue by Quality Assurance (QA). |
| Stage.2: Indent of R. M. & P.M. Requisitions by Production as per BMR. |
| Stage.3: Requisition checking & stamping the BMR by Quality Assurance (QA). |
| Stage.4: Dispensing of Raw & Packing Materials in presence of Production, QA & Store person. |
| Stage.5: (After Issuing) Verification of Raw & Packing Materials by Production person. |
| Stage.6: Equipment & Area Clearance by QA. |
| Stage 7: Preparation of Bulk in process (Intermediate) |
| Stage.8 : Centrifuge & Drying. |
| Stage.9. Milling of oversized granules if required. |
| Stage.10: Intermediate granules Sampling, Testing and Release by Quality Control (QC). |
| Stage.11: After Testing and Release of bulk or in process by Quality Control (QC), |
| Stage.12: QA in process Checking. bulk Wt variation, etc. |
| Stage 13 Wet product Drying ,after Milling and sifter |
| Stage.14: Line Clearance by QA for Packing Activity. |
| Stage.15: Overprinting & approval of Primary & Secondary Packing Materials. |
| Stage.16: Final Packing. |
| Stage.17: Collecting the retain samples by Q. C. |
| Stage.18: Finished product Sampling, Testing and Release of Finish Product by Quality Control (QC). |
| Stage19: Finished Product Transfer slip issued by approved chemist to Bonded Store Room. (BSR) / Finished Goods Store (FGS). |
| Stage.20: F. P. Inspection & release By Q. A. |
| Stage.21: Dispatch of F. P. |